18.2 Reform of the BIRREL crane bridge CH MOLINOS

18.2 Reform of the BIRREL crane bridge CH MOLINOS

Customer

Central Hidroeléctrica de Molinos

Description

Update of a crane bridge of a Hydroelectric Plant with the following characteristics:

Capacity: 30t

Light: 13.5m

Location: Molinos Hydroelectric Plant located La Torre de Cabdella - Lleida

Main works:

  • Hoist change
  • Change Motor Transmission of bridge crane with brake
  • Replacing the bare cable lines of the crane bridge power line by shielded line
  • Replacing the bare cable lines of the hoist with insulated hoses
  • New electrical cabinet with frequency converter in the translations.
  • Installation of radio control
  • Installation of acoustic and luminous warnings.

Uso de cookies

Este sitio web utiliza cookies para que usted tenga la mejor experiencia de usuario. Si continúa navegando está dando su consentimiento para la aceptación de las mencionadas cookies y la aceptación de nuestra política de cookies, pinche el enlace para mayor información. ACEPTAR

Aviso de cookies