GERMANS HOMS: Monorail crane bridge
Once again VINCA collaborates with our client, Germans Homs, to offer a solution to their needs in an optimal and effective way, adapting our equipment to the different installations of the client.
In the first place, it is a remounted 10t load overhead crane, totally adapting itself to the shape of the existing warehouse, thus making the most of the space and achieving a maximum height of height under hook of the crane bridge.
The second equipment is a 5t monorail bridge crane on a self-supporting structure, thus avoiding foundations for the pillars that support the rails.
Finally, a monorail bridge crane with a load of 5t is adapted to the client’s installations by making lateral cuts on both sides to avoid the existing luminaire. In addition, this installation has a system of ‘dead zones’, a system that prevents the equipment from acting and/or entering conflictive zones determined by the client.
This project is distinguished by the special customization of the design of our equipment to adapt to the needs of our customer in a versatile and effective.